91九色视频在线播放_色噜噜狠狠色综无码久久合_1级黄色大片_精品视频专区_天天射天天艹_精品无码中出一区二区

Monitoring Warning Released by National Energy Administration Requires No New Wind Power Project Built in China’s Six Provinces and Autonomous Regions
Author: 系統管理員 Post: 2017-03-25 Hits: 【Print】 【Close】

  2017 wind power investment monitoring warning released by National Energy Administration today indicates that provinces (autonomous regions), such as Inner Mongolia, Heilongjiang, Jilin, Ningxia, Gansu and Xinjiang (including Xinjiang Production and Construction Corps), are red alert areas for the development and construction of wind power, while other provinces remain as green areas. According to the warning, provinces (autonomous regions) with red alert are not allowed to build new wind power project and are required to take effective measures to solve the problem of curtailment of wind power.

  It is required by National Energy Administration that grid enterprises should not accept new applications for wind power integration projects (including project under construction, approved project and project incorporated into the planning) of provinces (autonomous regions) with red alert, and government agencies should not issue power generation business licenses for new wind power projects to above-mentioned provinces (autonomous regions). Meanwhile, National Energy Administration decides to suspend the construction of wind power projects including Xinjiang Zhundong New Energy Base, Turpan One-hundred-kilometer Wind Zone and the second batch of projects of Jiuquan Wind Power Base, and use the running transmission channels or transmission channels in progress to store and transport the power of existing projects.

  As for provinces without red alert, it is necessary for them to control the pace of constructing wind power projects, independently determine the annual construction scale and list of projects based on the implementation of construction conditions like market demands, and coordinately consider the connection of construction and utilization in case of new situations required for curbing power use.

  It is reported by journalist that in order to effectively increase the clean energy supply in Beijing-Tianjin-Tangshan Region, National Energy Administration has required Hebei Provincial Energy Bureau to accelerate the construction of the second phase of wind power projects of Chengde Base to ensure that all projects can be accepted by grid by the end of 2017, and orderly promote the construction of the third phase of wind power projects of Zhangjiakou Base according to the construction schedule of Zhangjiakou Renewable Energy Demonstration Zone. Scattered wind power projects will no longer be built in Zhangjiakou and Chengde.

Last:
Next:

top

Far East New Materials Co., Ltd. 蘇ICP備17010580號-1 ? 2017 All rights reserved
Contact us
400-822-6908
主站蜘蛛池模板: 城口县| 绥中县| 拜城县| 井研县| 明星| 新竹县| 城固县| 德令哈市| 抚顺县| 济源市| 寻乌县| 乌拉特后旗| 蛟河市| 神木县| 仪陇县| 祥云县| 津南区| 肥乡县| 芦溪县| 象州县| 忻城县| 濮阳县| 厦门市| 方山县| 峨山| 宜宾市| 通城县| 枝江市| 威信县| 东明县| 石家庄市| 宝兴县| 汝城县| 仪征市| 马公市| 阜宁县| 盐边县| 陈巴尔虎旗| 石屏县| 绥芬河市| 神池县|